Darya pala

Persian

Backgrounds and Experiences in Drinking Water Transfer Lines, Storage and Treatment

Main Activities

Finish Date

Start Date

Eng.

Man Hours

Client

Project Title

No.

 

Engineering ,blades supply, erection & unit commissioning Services

06/1996

01/1996

1500 M.H Engineering +  154,000,000 RLs. Procurement

(NIOEC)

Bandar Abbas Refinery 450 m3/day VC type water Desalination plant

(EPC)

 “2001”

1

5-5- Backgrounds and Experiences in Drinking Water Transfer

Lines, Storage and Treatment B) Completed  Projects

Project Construction Management

11/1996

02/1995

~ 11000

Kish Water & Power Company (KWPC)

Almahdi 1800 m3/day MED type

Water Desalination

“Bandar Abbas”

(MC)

“1001”

2

Engineering, erection & commissioning services for 2 units

01/1997

10/1996

~ 3000

(N.I.O.R. D.C.)

Bandar Abbas Refinery 2×450 m3/day VC type water Desalination Plant

 “2002”

3

Engineering, Erection & Commissioning Services for 2 units

09/1997

5/1997

~ 3600

(N.I.O.R. D.C.)

Bandar Abbas Refinery 2×450 m3/day VC Type Water Desalination Renovation

“2006”

4

Heat exchangers design

12/1997

10/1996

~ 1000

Kish Water & Power Company (KWPC)

Water Temp. Reduction System for  Water desalination

“ Kish Island “

“1007”

5

Design & construction

01/1998

07/1997

~ 2500 M.H+

377,000,000 Rls Supply & Construction

Almahdi Aluminum Complex

Almahdi Desalination Sea Water Intake Structure

“Bandar Abbas”

(EPC)

 “2004”

6

 Technical review of water transfer line for operation with one or two pump sets.

03/1999

03/1999

~ 500

Yazd Regional Water Co.

Water Transfer From Zayanderood to Yazd

“Yazd”

“3005”

7

5-5- Backgrounds and Experiences in Drinking Water Transfer

Lines, Storage and Treatment B) Completed  Projects

Basic design and detailed Engineering of raw water pool and water supply pump station building

11/2000

02/1999

~ 2500

(NIPEC)

Meydook Cupper Concentrate Complex

“Chahbahar”

“4002”

8

Basic and detail engineering and construction supervision.

09/2001

05/2000

~ 35000

Sistan & Baluchestan Regional

Water Co.

2×15000 m3/day MSF type water Desalination

“Chahbahar”                “3006”

9

Design and project Management.

03/2002

10/1995

~ 36000

Kish Water & Power Co.

(KWPC)

Lavan Refinery 2×1800 m3/day MED type water desalination Lavan Island

“Lavan Island”

(MC)

 “1004”

10

Feasibility study for water desalination plant in Hormozgan Power Plant

08/2006

08/2005

~2000

Tavanir

Hormozgan Desalination Plant

“6100”

11

Feasibility and Marketing  Studies for water Production In South provinces of Iran

03/2011

12/2009

~ 3000

Iran Power Plats projects Management (MAPNA)

Technical and Economical studies for water Production

“6183”

12