Darya pala

Persian

Backgrounds and Experiences in Power Generation, transmission and Distribution

Main Activities

Finish Date

Start Date

Eng.

Man Hours

Client

Project Title

No.

 

Review of tender documents, foreign turbine generator manufacturer  selection ,project management  and preparation of techno- financial proposal for the establishment of Power Plant for presentation to Tavanir

10/1996

05/1996

~ 3200

Industrial Project Management of Iran (IPMI)

Bonab 2 X325 MW steam.

Power Plant

“5001”

1

5-4- Backgrounds and Experiences in Power Generation,

 transmission and Distribution   B) Completed Projects:

Data collection and analysis, review of the electricity consumption growth and various power generation technologies
i.e diesel, gas, combined cycle and cogeneration with consideration of the climatic, environmental pollution ,fuel and water usage …and selection of optimization method.

12/1996

09/1996

~ 1500

Kish Water and Power Company (KWPC)

Kish Island Power Generation Development

“1006”

2

Inspection and  review of existing facilities, technical documents and  purchaser’s requirements, obtaining manufacturers’ data , preparation of equipment lists and technical documents for sale, through international tender.

05/1997

01/1997

~ 1000

Mazandaran Wood and Paper Industries Company

Mazandaran  Wood and Paper Factory Steam Turbine Generator and Heat Recovery Boiler

“Sari”

“5002”

3

Arrangement of  Kerman combined cycle Power Plant equipments general and special technical specifications consisting of 3 blocks , with a total capacity of

 1000 MW.

11/1997

08/1997

~ 500

Iran Power Development Company (IPDC)

Kerman 1000 MW Combined

Cycle Power Plant

“5006”

4

Collection and updating of preliminary studies and preparation of report for foreign capital investors.

12/98

11/98

~ 500

Iran Power Development Company

(IPDC)

Khoy Combined Cycle Power Plant

“Khoy”

“5009”

5

Preparation of equipment pricing tables for various types of gas turbines’, combined cycle, steam portion of combined cycle and steam power plants.

12/1998

10/1998

~500

Iran Power Development Company

(IPDC)

Power Plant Equipment Pricing Tables.

“Tehran “

“5008”

6

5-4- Backgrounds and Experiences in Power Generation,

 transmission and Distribution   B) Completed Projects:

Environmental, climatically, geological, seismic, water resources, fuels, access roads and electrical networks data collection for foreign investors

12/1998

10/1998

~1000

Iran Power Development Company

(IPDC)

Ali-Abad Combined Cycle Power Plant “Gorgan”

“5010”

7

Review of existing documents and preparation of Techno-economical report for the “Islamic Development Bank”.

12/1998

11/1998

~500

Tehran Regional Electric Company

Mossallah-Ghoorkhaneh U/G Cables & Vanak Substation

“Tehran”

“5013”

8

Preliminary studies and review of effective factors for the establishment a combined cycle Power Plant with a capacity 1000 MW next to Rudeshur Substation.

01/1999

10/1998

~1800

Iran Power Development Company

(IPDC)

Rudeshur Combined Cycle Power Plant “Tehran”

“5007”

9

Preparation of   technical, economical and financial report for the gas portion of the Kerman combined cycle Power Plant for the “Islamic Development Bank” financing.

03/1999

11/1998

~2200

Iran Power Development Company

(IPDC)

Kerman Combined Cycle Power Plant

 Gas Units

Kerman                   “5012”

10

Preparation of consulting services scope for the establishment of  thermal  power plants in the form of turn key contracts, including basic design, technical specifications tender documents and higher / site supervisions.

04/1999

03/1997

~6000

Iran Power Development Company

(IPDC)

Definition of Consulting Engineers Services

“Tehran”

“5004”

11

Review and modification of Power Plant  gas section tender commercial and technical documents for the financial support of the Islamic Development Bank.

09/1999

02/1999

~1000

Iran Power Development Company

(IPDC)

Kerman Combined Cycle Power Plant

“Kerman”

“5015”

12

Performance of studies end determination of combined optimization of gas and steam units of the Power Plant in such a way that it becomes convertible to combined cycle and to be in accordance with the client instructions.

09/1999

05/1999

~1000

Iran Power Development Company

(IPDC)

Kerman Combined Cycle Power Plant “Kerman”

“5016”

13

5-4- Backgrounds and Experiences in Power Generation,

 transmission and Distribution   B) Completed Projects:

Existing documents studies, review of Mobarakeh steel complex requirements, works volume and bound points scope, determination and report to MAPNA for the purpose of the arrangement of the expansion of the Power Plant proposal.

12/1999

11/1999

~700

Iran Power Plant Projects Management (MAPNA)

Expansion of Mobarakeh Steel Complex Power Plant.

“Mobarakeh Isfahan”

“5024”

14

Techno-economic studies report preparation, determination of project macro-goals and plans, executive guide lines and optimization, division of tasks, time schedules  and cost estimate.

08/2000

08/1997

~2200

Tavanir

Expansion of Shahid Rajaei Power Palnt

Project

“Qazvin”

“5003”

15

Preliminary studies and review of effective factors for the establishment of the Power Plant (consisting of environmental evaluation report)for the Jalal site in BOT contract form.

08/2000

10/1998

~4500

Iran Power Development Company

(IPDC)

Jalal Combined Cycle Power Plant

“Tehran”

“5011”

16

Determination of consulting engineering services scope designs of boundary, road around Power Plant, flood channels, main gate , guard house, tower,…. and tender documents preparation.

02/2001

09/1999

~2000

Iran Power Development Company

(IPDC)

Jalal Combined Cycle Power Plant

“Tehran”

 “5017”

17

Preparation of scope and definition for consulting engineering services work for the establishment of high voltage transmission lines and substations on turn key basis, inclusive of preliminary and final feasibility studies and project execution.

04/2001

01/2000

~6000

Khorassan regional Electric Company

Definition of Consulting Engineers Services for H.V Transmission lines and S/S

“Mashhad”

“5022”

18

5-4- Backgrounds and Experiences in Power Generation,

 transmission and Distribution   B) Completed Projects:

Survey and studies for access road, water supply, electrical power provision and networks for the Power Plant construction period.

05/2001

09/1999

~3000

Iran Power Development Company

(IPDC)

Jalal Combined Cycle Power Plant

“Tehran”

“5019”

19

Review of technical documents  and energy conversion agreement  for “BOT” committee and preparation of technical and commercial documents for the establishment of Power Plant in BOT contract form, cooperation in tender procedures, proposal evaluation and participation in contract negotiations

05/2001

09/1999

~8000

Iran Power Development Company

 (IPDC)

Pareh Sar 1000 MW  Combined Cycle Power Plant

“Pareh Sar –Gilan”

“5018”

20

Compilation of client’s viewpoints and completion of the documents for an Energy Conversion Agreement (ECA), in “BOT” form and review of European Companies proposals.

02/2002

03/2001

~3000

Iran Power Development Company

(IPDC)

Jalal and Tabriz Combined Cycle Power Plants

“Tehran & Tabriz”

“5025”

21

Preparation of a techno-economic and financial feasibility report for Kerman combined cycle Power Plant (steam generation unit) for the Islamic Development Bank

08/2002

01/2002

~1800

Iran Power Development Company

(IPDC)

Kerman Combined Cycle Power Plant -steam portion

“Kerman”

“5037”

22

Preliminary studies, basic and detailed design for the neutralization and dispach of Power Plant waste water.

11/2002

04/1999

~3500

Iran Power Development Company

(IPDC)

Montazer Ghaem Steam Power Plant- Design of waste water neutralization

“Shahriar”

“5020”

23

Recognition and review of market consumption of gas, combined cycle and steam power plants for next 10 years.

09/2003

09/2001

~4000

Tavanir -Deputy  of Research and Technology

Market Consumption Research for Power Plant Parts and Components

“Tehran”                    “5034”

24

5-4- Backgrounds and Experiences in Power Generation,

 transmission and Distribution   B) Completed Projects:

Shirvan (BOT tender documents)

And consulting services

10/2003

01/2002

~7000

Iran Power Development Company

(IPDC)

Shirvan, Jalal (Tehran) and Pareh Sar (Gilan) Power Plants

 “5038”

25

Consulting and supervision services for research in manufacturing a model unit.

11/2003

01/2002

~2500

Tavanir -Deputy  of Research and Technology

Manufacturing a 200KW Model

Turbo-generator

“Tehran”

“5035”

26

Preparation of  techno-economic-financial for Network Development Report for the Islamic Development Bank

01/2004

01/2002

~500

Tehran Regional Electric Company

Sh. Firouzi Substation Development and Renovation

“5050”

27

Performance of feasibility studies for development of Qom combined cycle Power Plant by considering 4×250 MW gas units for the World Bank.

03/2004

01/2002

~4000

Tehran Regional Electric Company

Qom Combined Cycle Power Plant

“Qom”

“5046”

28

Feasibility Studies for 2 gas power plants convertible to combined cycle with the capacity of 500+20MW each.

03/2004

11/2002

~3000

Tavanir (Deputy  of research and technology)

Khorram Abad 1&2

500MW Power Plant

“Khoram Abad”

“5043”

29

Techno-economic- financial studies for  Network Development for Islamic Development Bank

04/2004

04/2004

~1800

Fars Regional Electric Company

Fars & Bushehr Provinces Transmission Lines and S.S. Develpment

“5049”

30

Environment studies and obtaining Iran Environment Protection Organization’s approval for Tabas coal fired Power Plant and Mazino-1 coal mines

06/2004

02/2003

~2000

Iran Power Development Company (IPDC)

Tabas Coal Fired Power Plant Environment Impact Studies

Tehran

“5045”

31

M.T.O for auxiliary systems in Mechanical, Electrical and I&C disciplines, basic and detail design for Power Plant site area civil works.

08/2004

05/2002

~6800

Iran Power Plant Projects Management (MAPNA)

Damavand Combined Cycle Power Plant (6×159MW)

Damavand

“5040”

32

5-4- Backgrounds and Experiences in Power Generation,

 transmission and Distribution   B) Completed Projects:

Basic and detailed designs for the 2nd.6 units of Damavand Power Plant site area civil works

08/2004

05/2002

~3400

Iran Power Plant Projects Management (MAPNA)

Damavand Combined Cycle Power Plant (12×159MW)

“Damavand”

“5042”

33

Preparation of a Techno-Economical Feasibility Study Report for Qom combined cycle Extension.

05/2005

02/2005

~1500

Tehran Regional Electric Company

Qom Power Plant

 “5057”

34

Feasibility Study for Kashan Gas Power Plant established by private sector

( B.O.O)

05/2005

06/2004

~3200

Esfahan Regional Electric Company

Kashan Gas Power Plant

“5054”

35

 Studies for proper site selections for the establishment of Zanjan 1st & 2nd gas power plants with a capacity of 500MW each, within the boundary of Zanjan province be executed in the  B.O.O method.

05/2005

10/2004

~4000

Zanjan Regional Electric Company

Zanjan Gas Turbine Power Plant Feasibility Study

“Zanjan”

“5056”

36

Preparation of criteria for participation in international tenders and evaluations methods for various types of contracts. (purchase of license, technology transfer, equipment, EPC, EP and finance).

02/2006

05/2002

~4300

Iranian Management &Planning Organization

International Tender Principles

 “Tehran”

“5039”

37

Earth quake Resistance studies of structures

05/2006

05/2003

~11000

Tavanir

Tabriz & Hamedan Power Plants

“5048”

38

Study , environmental report & obtaining Authorization for 500MW Khorram Abad 1&2 power plants

02/2006

02/2005

~2500

Tavanir

Khorram Abad Power Plant

“Khorram Abad”

“5058”

39

Study and recognition of major electrical equipment supply situation for the Power Industry-generation sector.

04/2006

08/2004

~12000

Tavanir

Electrical Equipment Supply Situation

“Tehran”

“5055”

40

Studies and reviews of current practice for steam units repowering by gas turbines

07/2006

06/2004

~5000

Tavanir

Repowering of Steam Units

“Tehran”

“5047”

41

5-4- Backgrounds and Experiences in Power Generation,

 transmission and Distribution   B) Completed Projects:

Engineering services, higher and site supervision on the Rudeshur gas Power Plant executing operations.

07/2006

12/2002

~33000 M.H  Engineering+

+200M.M Site Supervision

Arian Mahtab Gostar Co.

Rudeshur 2000MW gas Power Plant

                “Rudeshur  Tehran”

 “5044”

42

Kashan Power Plant Environmental Report

11/2006

05/2005

~2500

Isfahan Regional Electric Company

Kashan Power Plant

 “5061”

43

Consulting Services for Kermanshah  gas power plant

11/2006

07/2005

~1500

Tavanir

Kermanshah Power Palnt

“5062”

44

6×159MW power plants engineering services in Tehran office and site supervision

02/2007

03/2004

18500 M.H+

100 M.H site Inspection

Iran Power Development Company

(IPDC)

South Isfahan Private Power Plant

“5053”

45

Feasibility Study for expansion turbines Installation in 4 selected power plants

02/2007

09/2005

~10000

Ministry of Energy Power Deputy

Expansion Turbines

 “5064”

46

Consulting services for Khorram Abad 1 Private Power Plant

02/2007

02/2005

~2500

Tavanir

Khorram Abad Power Plant

” Khorram Abad”

 “5059”

47

Consulting Services for Khorram Abad 2 Private power plant

03/2007

03/2005

~2500

Tavanir

Khorram Abad Power Plant

“Khorram Abad”

“5060”

48

Basic Design and preparing tender documents for purchasing Gas Turbine power unit for Gas Gathering and Kharg NGL project

06/2007

02/2007

~1000

Bita Innovative Design Eng.Co.  (IPDC)

Tender Documents for purchasing Gas Turbine preparing power unit

“5066”

49

Engineering services for power plant operation and Energy Conversion Agreement (ECA) and Contract invoices approval

08/2007

03/2005

~3800

Iran Power Development Company

(IPDC)

South Isfahan Private power plant

“5053- I ”

50

5-4- Backgrounds and Experiences in Power Generation,

 transmission and Distribution   B) Completed Projects:

Feasibility study, Optimization of units, Techno. Contractual negotiations preparing Energy Conversion Agreement (ECA)….

01/2008

05/2006

~1000

Iran Power Development Company

(IPDC)

Sarakhs 500 MV Power Plantin BOO basis

“5065”

51

Feasibility Study for Gas motor installation with CHP System

02/2008

09/2005

~64000 M.M + 16man/month Eng. Services & site Supervision

Ministry of Energy Power Deputy

Gas  Fuel Generator

 “5063”

52

Consulting and supervision services for Energy Conversion Agreement (ECA)

07/2009

01/2009

~ 5500

Isfahan Regional Electric Co.

Consulting and supervision  on Energy Conversion Agreement for chehelseton Power Plant

“5707”

53

Preparing unit price schedule

02/2010

12/2007

~ 4100

Tehran Regional Electric Co.

Preparing unit price schedule for Over Head Transmission and High Voltage Lines

“5702”

54

Preparing unit price schedule

02/2010

12/2007

~ 4500

Tehran Regional Electric Co.

Preparing unit price schedule for Cable Transmission and High Voltage lines

“5703”

55

Consulting and supervision service for Energy conversion Agreement (ECA) and approval invoices

07/2010

07/2009

~9700

Isfahan Regional Electric Co

Consulting and supervision in production of Chehelseton Power Plant

“5708”

56

Engineering services and detail design for power supply

07/2010

09/2008

~2000

Oil and Energy development industries Co.

Optimization of production units in Haftkel oil field

“5705”

57

Engineering Services and Supervision

9/2010

9/2011

~60 M.M

Esfahan

 Regional Electric Co.

Operation Supervision  and consulting services in Cheheseton  power plant

“5715”

58