Review of tender documents, foreign turbine generator manufacturer selection ,project management and preparation of techno- financial proposal for the establishment of Power Plant for presentation to Tavanir |
10/1996 |
05/1996 |
~ 3200 |
Industrial Project Management of Iran (IPMI) |
Bonab 2 X325 MW steam. Power Plant
“5001” |
1 |
5-4- Backgrounds and Experiences in Power Generation, transmission and Distribution B) Completed Projects: |
Data collection and analysis, review of the electricity consumption growth and various power generation technologies |
12/1996 |
09/1996 |
~ 1500 |
Kish Water and Power Company (KWPC) |
Kish Island Power Generation Development
“1006” |
2 |
|
Inspection and review of existing facilities, technical documents and purchaser’s requirements, obtaining manufacturers’ data , preparation of equipment lists and technical documents for sale, through international tender. |
05/1997 |
01/1997 |
~ 1000 |
Mazandaran Wood and Paper Industries Company |
Mazandaran Wood and Paper Factory Steam Turbine Generator and Heat Recovery Boiler “Sari” “5002” |
3 |
|
Arrangement of Kerman combined cycle Power Plant equipments general and special technical specifications consisting of 3 blocks , with a total capacity of 1000 MW. |
11/1997 |
08/1997 |
~ 500 |
Iran Power Development Company (IPDC) |
Kerman 1000 MW Combined Cycle Power Plant “5006” |
4 |
|
Collection and updating of preliminary studies and preparation of report for foreign capital investors. |
12/98 |
11/98 |
~ 500 |
Iran Power Development Company (IPDC) |
Khoy Combined Cycle Power Plant “Khoy” “5009” |
5 |
|
Preparation of equipment pricing tables for various types of gas turbines’, combined cycle, steam portion of combined cycle and steam power plants. |
12/1998 |
10/1998 |
~500 |
Iran Power Development Company (IPDC) |
Power Plant Equipment Pricing Tables. “Tehran “ “5008” |
6 |
5-4- Backgrounds and Experiences in Power Generation, transmission and Distribution B) Completed Projects: |
Environmental, climatically, geological, seismic, water resources, fuels, access roads and electrical networks data collection for foreign investors |
12/1998 |
10/1998 |
~1000 |
Iran Power Development Company (IPDC) |
Ali-Abad Combined Cycle Power Plant “Gorgan” “5010” |
7 |
|
Review of existing documents and preparation of Techno-economical report for the “Islamic Development Bank”. |
12/1998 |
11/1998 |
~500 |
Tehran Regional Electric Company |
Mossallah-Ghoorkhaneh U/G Cables & Vanak Substation “Tehran” “5013” |
8 |
|
Preliminary studies and review of effective factors for the establishment a combined cycle Power Plant with a capacity 1000 MW next to Rudeshur Substation. |
01/1999 |
10/1998 |
~1800 |
Iran Power Development Company (IPDC) |
Rudeshur Combined Cycle Power Plant “Tehran” “5007” |
9 |
|
Preparation of technical, economical and financial report for the gas portion of the Kerman combined cycle Power Plant for the “Islamic Development Bank” financing. |
03/1999 |
11/1998 |
~2200 |
Iran Power Development Company (IPDC) |
Kerman Combined Cycle Power Plant Gas Units Kerman “5012” |
10 |
|
Preparation of consulting services scope for the establishment of thermal power plants in the form of turn key contracts, including basic design, technical specifications tender documents and higher / site supervisions. |
04/1999 |
03/1997 |
~6000 |
Iran Power Development Company (IPDC) |
Definition of Consulting Engineers Services “Tehran” “5004” |
11 |
|
Review and modification of Power Plant gas section tender commercial and technical documents for the financial support of the Islamic Development Bank. |
09/1999 |
02/1999 |
~1000 |
Iran Power Development Company (IPDC) |
Kerman Combined Cycle Power Plant “Kerman” “5015” |
12 |
|
Performance of studies end determination of combined optimization of gas and steam units of the Power Plant in such a way that it becomes convertible to combined cycle and to be in accordance with the client instructions. |
09/1999 |
05/1999 |
~1000 |
Iran Power Development Company (IPDC) |
Kerman Combined Cycle Power Plant “Kerman” “5016” |
13 |
5-4- Backgrounds and Experiences in Power Generation, transmission and Distribution B) Completed Projects: |
Existing documents studies, review of Mobarakeh steel complex requirements, works volume and bound points scope, determination and report to MAPNA for the purpose of the arrangement of the expansion of the Power Plant proposal. |
12/1999 |
11/1999 |
~700 |
Iran Power Plant Projects Management (MAPNA) |
Expansion of Mobarakeh Steel Complex Power Plant. “Mobarakeh Isfahan” “5024” |
14 |
|
Techno-economic studies report preparation, determination of project macro-goals and plans, executive guide lines and optimization, division of tasks, time schedules and cost estimate. |
08/2000 |
08/1997 |
~2200 |
Tavanir |
Expansion of Shahid Rajaei Power Palnt Project “Qazvin” “5003” |
15 |
|
Preliminary studies and review of effective factors for the establishment of the Power Plant (consisting of environmental evaluation report)for the Jalal site in BOT contract form. |
08/2000 |
10/1998 |
~4500 |
Iran Power Development Company (IPDC) |
Jalal Combined Cycle Power Plant “Tehran” “5011” |
16 |
|
Determination of consulting engineering services scope designs of boundary, road around Power Plant, flood channels, main gate , guard house, tower,…. and tender documents preparation. |
02/2001 |
09/1999 |
~2000 |
Iran Power Development Company (IPDC) |
Jalal Combined Cycle Power Plant “Tehran” “5017” |
17 |
|
Preparation of scope and definition for consulting engineering services work for the establishment of high voltage transmission lines and substations on turn key basis, inclusive of preliminary and final feasibility studies and project execution. |
04/2001 |
01/2000 |
~6000 |
Khorassan regional Electric Company |
Definition of Consulting Engineers Services for H.V Transmission lines and S/S “Mashhad” “5022” |
18 |
5-4- Backgrounds and Experiences in Power Generation, transmission and Distribution B) Completed Projects: |
Survey and studies for access road, water supply, electrical power provision and networks for the Power Plant construction period. |
05/2001 |
09/1999 |
~3000 |
Iran Power Development Company (IPDC) |
Jalal Combined Cycle Power Plant “Tehran” “5019” |
19 |
|
Review of technical documents and energy conversion agreement for “BOT” committee and preparation of technical and commercial documents for the establishment of Power Plant in BOT contract form, cooperation in tender procedures, proposal evaluation and participation in contract negotiations |
05/2001 |
09/1999 |
~8000 |
Iran Power Development Company (IPDC) |
Pareh Sar 1000 MW Combined Cycle Power Plant “Pareh Sar –Gilan”
“5018” |
20 |
|
Compilation of client’s viewpoints and completion of the documents for an Energy Conversion Agreement (ECA), in “BOT” form and review of European Companies proposals. |
02/2002 |
03/2001 |
~3000 |
Iran Power Development Company (IPDC) |
Jalal and Tabriz Combined Cycle Power Plants “Tehran & Tabriz” “5025” |
21 |
|
Preparation of a techno-economic and financial feasibility report for Kerman combined cycle Power Plant (steam generation unit) for the Islamic Development Bank |
08/2002 |
01/2002 |
~1800 |
Iran Power Development Company (IPDC) |
Kerman Combined Cycle Power Plant -steam portion “Kerman” “5037” |
22 |
|
Preliminary studies, basic and detailed design for the neutralization and dispach of Power Plant waste water. |
11/2002 |
04/1999 |
~3500 |
Iran Power Development Company (IPDC) |
Montazer Ghaem Steam Power Plant- Design of waste water neutralization “Shahriar” “5020” |
23 |
|
Recognition and review of market consumption of gas, combined cycle and steam power plants for next 10 years. |
09/2003 |
09/2001 |
~4000 |
Tavanir -Deputy of Research and Technology |
Market Consumption Research for Power Plant Parts and Components “Tehran” “5034” |
24 |
5-4- Backgrounds and Experiences in Power Generation, transmission and Distribution B) Completed Projects: |
Shirvan (BOT tender documents) And consulting services |
10/2003 |
01/2002 |
~7000 |
Iran Power Development Company (IPDC) |
Shirvan, Jalal (Tehran) and Pareh Sar (Gilan) Power Plants “5038” |
25 |
|
Consulting and supervision services for research in manufacturing a model unit. |
11/2003 |
01/2002 |
~2500 |
Tavanir -Deputy of Research and Technology
|
Manufacturing a 200KW Model Turbo-generator “Tehran” “5035” |
26 |
|
Preparation of techno-economic-financial for Network Development Report for the Islamic Development Bank |
01/2004 |
01/2002 |
~500 |
Tehran Regional Electric Company |
Sh. Firouzi Substation Development and Renovation “5050” |
27 |
|
Performance of feasibility studies for development of Qom combined cycle Power Plant by considering 4×250 MW gas units for the World Bank. |
03/2004 |
01/2002 |
~4000 |
Tehran Regional Electric Company |
Qom Combined Cycle Power Plant “Qom” “5046” |
28 |
|
Feasibility Studies for 2 gas power plants convertible to combined cycle with the capacity of 500+20MW each. |
03/2004 |
11/2002 |
~3000
|
Tavanir (Deputy of research and technology) |
Khorram Abad 1&2 500MW Power Plant “Khoram Abad” “5043” |
29 |
|
Techno-economic- financial studies for Network Development for Islamic Development Bank |
04/2004 |
04/2004 |
~1800 |
Fars Regional Electric Company |
Fars & Bushehr Provinces Transmission Lines and S.S. Develpment “5049” |
30 |
|
Environment studies and obtaining Iran Environment Protection Organization’s approval for Tabas coal fired Power Plant and Mazino-1 coal mines |
06/2004 |
02/2003 |
~2000 |
Iran Power Development Company (IPDC) |
Tabas Coal Fired Power Plant Environment Impact Studies Tehran “5045” |
31 |
|
M.T.O for auxiliary systems in Mechanical, Electrical and I&C disciplines, basic and detail design for Power Plant site area civil works. |
08/2004 |
05/2002 |
~6800 |
Iran Power Plant Projects Management (MAPNA) |
Damavand Combined Cycle Power Plant (6×159MW) Damavand “5040” |
32 |
5-4- Backgrounds and Experiences in Power Generation, transmission and Distribution B) Completed Projects: |
Basic and detailed designs for the 2nd.6 units of Damavand Power Plant site area civil works |
08/2004 |
05/2002 |
~3400 |
Iran Power Plant Projects Management (MAPNA) |
Damavand Combined Cycle Power Plant (12×159MW) “Damavand” “5042” |
33 |
|
Preparation of a Techno-Economical Feasibility Study Report for Qom combined cycle Extension. |
05/2005 |
02/2005 |
~1500 |
Tehran Regional Electric Company |
Qom Power Plant “5057” |
34 |
|
Feasibility Study for Kashan Gas Power Plant established by private sector ( B.O.O) |
05/2005 |
06/2004 |
~3200 |
Esfahan Regional Electric Company |
Kashan Gas Power Plant “5054” |
35 |
|
Studies for proper site selections for the establishment of Zanjan 1st & 2nd gas power plants with a capacity of 500MW each, within the boundary of Zanjan province be executed in the B.O.O method. |
05/2005 |
10/2004 |
~4000 |
Zanjan Regional Electric Company |
Zanjan Gas Turbine Power Plant Feasibility Study “Zanjan” “5056” |
36 |
|
Preparation of criteria for participation in international tenders and evaluations methods for various types of contracts. (purchase of license, technology transfer, equipment, EPC, EP and finance). |
02/2006 |
05/2002 |
~4300 |
Iranian Management &Planning Organization |
International Tender Principles “Tehran” “5039” |
37 |
|
Earth quake Resistance studies of structures |
05/2006 |
05/2003 |
~11000 |
Tavanir |
Tabriz & Hamedan Power Plants “5048” |
38 |
|
Study , environmental report & obtaining Authorization for 500MW Khorram Abad 1&2 power plants |
02/2006 |
02/2005 |
~2500 |
Tavanir |
Khorram Abad Power Plant “Khorram Abad” “5058” |
39 |
|
Study and recognition of major electrical equipment supply situation for the Power Industry-generation sector. |
04/2006 |
08/2004 |
~12000 |
Tavanir |
Electrical Equipment Supply Situation “Tehran” “5055” |
40 |
|
Studies and reviews of current practice for steam units repowering by gas turbines |
07/2006 |
06/2004 |
~5000 |
Tavanir |
Repowering of Steam Units “Tehran” “5047” |
41 |
5-4- Backgrounds and Experiences in Power Generation, transmission and Distribution B) Completed Projects: |
Engineering services, higher and site supervision on the Rudeshur gas Power Plant executing operations. |
07/2006 |
12/2002 |
~33000 M.H Engineering+ +200M.M Site Supervision |
Arian Mahtab Gostar Co. |
Rudeshur 2000MW gas Power Plant “Rudeshur Tehran” “5044” |
42 |
|
Kashan Power Plant Environmental Report |
11/2006 |
05/2005 |
~2500 |
Isfahan Regional Electric Company |
Kashan Power Plant “5061” |
43 |
|
Consulting Services for Kermanshah gas power plant |
11/2006 |
07/2005 |
~1500 |
Tavanir |
Kermanshah Power Palnt “5062” |
44 |
|
6×159MW power plants engineering services in Tehran office and site supervision |
02/2007 |
03/2004 |
18500 M.H+ 100 M.H site Inspection |
Iran Power Development Company (IPDC) |
South Isfahan Private Power Plant
“5053” |
45 |
|
Feasibility Study for expansion turbines Installation in 4 selected power plants |
02/2007 |
09/2005 |
~10000 |
Ministry of Energy Power Deputy |
Expansion Turbines “5064” |
46 |
|
Consulting services for Khorram Abad 1 Private Power Plant |
02/2007 |
02/2005 |
~2500 |
Tavanir |
Khorram Abad Power Plant ” Khorram Abad” “5059” |
47 |
|
Consulting Services for Khorram Abad 2 Private power plant |
03/2007 |
03/2005 |
~2500 |
Tavanir |
Khorram Abad Power Plant “Khorram Abad” “5060” |
48 |
|
Basic Design and preparing tender documents for purchasing Gas Turbine power unit for Gas Gathering and Kharg NGL project |
06/2007 |
02/2007 |
~1000 |
Bita Innovative Design Eng.Co. (IPDC) |
Tender Documents for purchasing Gas Turbine preparing power unit “5066” |
49 |
|
Engineering services for power plant operation and Energy Conversion Agreement (ECA) and Contract invoices approval |
08/2007 |
03/2005 |
~3800 |
Iran Power Development Company (IPDC) |
South Isfahan Private power plant
“5053- I ” |
50 |
5-4- Backgrounds and Experiences in Power Generation, transmission and Distribution B) Completed Projects: |
Feasibility study, Optimization of units, Techno. Contractual negotiations preparing Energy Conversion Agreement (ECA)…. |
01/2008 |
05/2006 |
~1000 |
Iran Power Development Company (IPDC) |
Sarakhs 500 MV Power Plantin BOO basis
“5065” |
51 |
|
Feasibility Study for Gas motor installation with CHP System |
02/2008 |
09/2005 |
~64000 M.M + 16man/month Eng. Services & site Supervision |
Ministry of Energy Power Deputy |
Gas Fuel Generator
“5063” |
52 |
|
Consulting and supervision services for Energy Conversion Agreement (ECA) |
07/2009 |
01/2009 |
~ 5500 |
Isfahan Regional Electric Co. |
Consulting and supervision on Energy Conversion Agreement for chehelseton Power Plant “5707” |
53 |
|
Preparing unit price schedule |
02/2010 |
12/2007 |
~ 4100 |
Tehran Regional Electric Co. |
Preparing unit price schedule for Over Head Transmission and High Voltage Lines “5702” |
54 |
|
Preparing unit price schedule |
02/2010 |
12/2007 |
~ 4500 |
Tehran Regional Electric Co. |
Preparing unit price schedule for Cable Transmission and High Voltage lines “5703” |
55 |
|
Consulting and supervision service for Energy conversion Agreement (ECA) and approval invoices |
07/2010 |
07/2009 |
~9700 |
Isfahan Regional Electric Co |
Consulting and supervision in production of Chehelseton Power Plant “5708” |
56 |
|
Engineering services and detail design for power supply |
07/2010 |
09/2008 |
~2000 |
Oil and Energy development industries Co. |
Optimization of production units in Haftkel oil field “5705” |
57 |
|
Engineering Services and Supervision |
9/2010 |
9/2011 |
~60 M.M |
Esfahan Regional Electric Co. |
Operation Supervision and consulting services in Cheheseton power plant “5715” |
58 |