Backgrounds and Experiences in Oil & Gas Transfer Pipelines

Main Activities

Finish Date

Start Date

Eng.

Man Hours

Client

Project Title

No.

Route finding and final selection, performance
of survey plans ,soil machineries studies , preliminary and detail designs,
preparation of work drawings and tender documents.

09/2000

09/1999

~33000

(E.I.E.D)

NGL Transfer Pipelines

1200 and 1300 of about 155km from Gas &
NGL plants

Gachsaran – Bibi Hakimeh

“6005 – I ”

1

5-2- Backgrounds and Experiences in Oil &
Gas Transfer Pipelines

B) Completed Projects:

Review and announcement of any project difficulties
and providing proper solutions.

09/2001

10/2000

~5000

(E.I.E.D)

Site Engineering Support Services for NGL
Transfer Pipelines from Gas & NGL plants 1200and 1300

to Gachsaran – Bibi Hakimeh “6005- II”

2

Rendering design and engineering services
for the preparation of proposals for different oil and gas transfer
pipeline projects.

03/2002

10/2001

~2200

(O.I.E.C)

Engineering Services

(Technical Assistance)

“6025”

3

Basic and detail design review and Procurement
engineering services

08/2004

09/2002

~24000

Tehran

Jonoob Co.

Engineering Services for

56 Inch Pipeline

For South Pars-Phase 4 and 5 (67 km)

Asaluyeh-Kangan

“6035”

4

Conceptual Study, Basic design and EPC contract
package document preparation

(Including Cost Estimation)

11/2005

04/2005

~7200

(NIOEC)

Imam Taghi Pump Station Increasing Capacity
of Oil Products Project

“6065”

5

Review of manufacturers and technical proposals
and evaluation turbines, generators, pumps and gas station packages.

02/2006

02/2005

~5000

Oil Turbo Compressor (OTC)

Engineering and Procurement Services for

Phase 6,7,8 South Pars Gas Compressor units

“6092”

6

Detail design ,Procurement, Building Construction
and Commissioning of Gas Export metering station

05/2007

09/2006

6000M.H Engineering +

23,000,000,000 RLs.

(NIOC)

Jolfa Gas Export Metering Station

(EPC)

“6099”

7

Basic Engineering

11/2007

02/2006

~25400

Qeshm

Investment

Co.

Bandar Abbas Crude

Oil Supply Project via

Qeshm Island.

“6108”

8

5-2- Backgrounds and Experiences in Oil
& Gas Transfer Pipelines B) Completed Projects:

Surveying, Geotechnical Study, Environmental
Study and Basic engineering design services

and EPC package preparation

11/2007

03/2006

~10000

(NIOEC)

Mahshahr-Abadan 16″ Product Pipe Line &
Facilities

“6114”

9

Performing Basic and detail engineering
of 36 inch Onshore & Offshore

Pipeline pumping station &

Associated Facilities.

01/2008

04/2007

~10000

Rampkoh

Co.

Azadegan Oil Field Crude Oil

Transmission Pipeline

“6133”

10

Data Gathering and Tender Document Preparation
in Contractual and Technical Sections for “BOO” Method 9th
Gas Pipeline Project

11/2008

07/2007

~8800

(NIGC)

Data Gathering and Tender Document Preparation
for 9th Gas Line Project in “BOO” Method

“6129”

11

Job description and Tender Document Preparation

02/2009

10/2008

~1000

Oil Turbo compressor (OTC)

Conceptual Study and Basic Design Job Description
for SAL Terminal to Neka Storage Tanks

“6171”

12

Gathering Information and EPC Document preparation

03/2009

08/2008

~800

Bushehr Gas Co.

Tender Preparation for Gas Transmission
to Bushehr Province in “BOO” Method

“6166”

13

Detailed Engineering for Onshore and Offshore
sections

09/2010

07/2006

~40000

Qeshm Oil Investment Co. MC: Moeen Energy
Paya Co.

Bandar Abbas Refinery Crude Oil Supply Via
Qeshm Island

“6116”

14

Basic Design and Detail Engineering

09/2010

06/2008

~6500

Jonoob Sazeh

26″ Pipeline Replacement from Razan to Shazand
Arak KM 465

“6161”

15