Backgrounds and Experiences in Oil Refinery, Gas and Petrochemical Industries

Main Activities

Finish Date

Start Date

Eng.

Man Hours

Client

Project Title

No.

Preparation of As-Built drawings.

07/1998

08/1997

~10000

(O.I.E.C)

Gas Treatment (GTU4) and Sulfur Recovery
(SRU) Units of Khangiran Gas Treatment Plant

“6001”

1

5-1- Backgrounds and Experiences
in Oil Refinery, Gas and Petrochemical Industries B) Completed
Projects:

Detail design of pipelines by titanium and CPVC material.

09/2000

09/1999

~16000

(B.I.P.C)

Bandar Imam Kimia Co-Chlor Alkaline Unit
"Bandar Imam Petrochemical"

“6003”

2

Bid Documents preparation based on existing documents.

03/2001

01/2001

~400

Sina Chemical Co.

2nd Unit Hexamine Plant

Sina Chemical Co.

Shiraz

“6015”

3

Detail design based on ASME and preparation of technical
bid documents.

06/2001

01/2001

~600

Ab Niroo Co.

double Layer Nitrogen

Storage Tank

Bandar Imam Petrochemical Co.

“6013”

4

Piping basic design by CAD WORX software.

07/2001

12/2000

~26000

Cheghalesh Engineering Co.

Polyester Manufactures"P.E.T-1”and Polycondensation
plant (182 ton /day each)

"Bandar Imam"

“6006”

5

Design and preparation of isometric drawings
for under 2" C.S and 1 1/2 " S.S pipes

12/2001

09/2001

~4000

Cheghalesh Engineering Co.

P.E.T-1 Project-HTM Area & Poly "A"

Units

"Bandar Imam"

“6031”

6

5-1- Backgrounds and Experiences in Oil
Refinery, Gas and Petrochemical Industries

B) Completed Projects:

Piping detail design using CAD WORX software.

01/2002

08/2001

~5500

Cheghalesh Engineering Co.

P.E.T-1 Project-HTM Area & Poly "B"

"Bandar Imam"

“6024”

7

Fixed equipment detail design of 200 sets
of heat exchanges ,pressurized storages ,desalination unit ,liquid separation
and polishing plant using PV-Elite software. Review an approval of manufacturer’s
drawings.

02/2002

12/1999

~21500

(E.I.E.D)

NGL 1200/1300 Fixed Equipment

Gachsaran

“6008”

8

Piping, electrical, I&C systems and steel
structural designs.

03/2002

09/2000

~7700

Bandar Imam Kimia Co.

New Cloridric Acid unit of Kimia Chlor Alkaline
co. plant

"Bandar Imam Petrochemical"

“6011”

9

Design and procurement services for piping
,electrical ,I&C, buildings ,

(phase I), PTAI ,FETI cooling towers and
interconnection lines between units.

03/2002

07/2001

~31600

Shahid Tondgooyan Petrochemical Co.

Design ,Engineering and Assistance for WWTP
units & PET1/PTA1-Interconections of Tondgooyan Petrochemicals ( phase
I) Bandar Imam

“6023 / I

10

Design, supply, installation and commissioning
of hardware and software .

05/2002

02/2001

5000 M.H + $

2 millions software and Hardware Bud jet

Bandar Abbas Refinery

DCS control System Upgrade of Bandar Abbas
refinery

(EPC)

“6012”

11

Review of Manufacturers’ technical documents
(as built drawings, calculations, WPS and….) regarding 75 numbers of
heat exchangers and pressure vessels.

05/2002

08/2001

~5000

(E.I.E.D)

OLEFIN 7 Project

"Maroon"

“6030”

12

5-1- Backgrounds and Experiences in Oil
Refinery, Gas and Petrochemical Industries

B) Completed Projects:

Supervision on piping installations

07/2002

11/1999

~8000

Bandar Imam Petrochemical Co.

Chlor Akaline Unit of Kimia Co.

"Bandar Imam Petrochemical"

“6003”

13

Detail design of piping system, MTO , provision
of purchase orders and review of Manufacturers’ documents.

09/2003

02/2000

~135000

(E.I.E.D)

Gas and NGL 1200/1300 Plants

"Gachsaran"

“6010”

14

Design of electrical and piping systems
and preparation of tender technical documents.

09/2003

02/2003

~11000

Arak Petrochemical Co.

Ethooxilation Plant Project

"Arak Petrochemical "

“6034”

15

Design and engineering services for renovation
and reconstruction for sub-companies (Faravaresh, Kimia,Basparan, Abniroo,
Kharazmi) – 90 separate work orders.

03/2005

03/2002

~165000

Bandar Imam Petrochemical Co

Design & Engineering Services

(Technical Assistance)

"Bandar Imam Petrochemical Co."

“6014”

16

Data gathering, preliminary engineering
studies, and preparation of EPC tender documents.

07/2004

05/2003

~5700

(NISOC)

Turbine Drives Replacement at NGL 200/300

"Aghajari"

“6045”

17

Engineering services for reconstruction
and renovation projects of Faravaresh Co. within Ab Niroo Co.’s separate
work orders.

07/2004

07/2003

~2500

Ab Niroo Co. (B.I.P.C)

Engineering & Design Services

(Technical Assistance)

"Bandar Imam Petrochemical"

“6057”

18

Basic& detail designs of piping, electrical,
I&C, and civil, procurement and site engineering services

08/2004

09/2001

~20000

Jahan Pars Engineering and Construction
Co.

Bid Boland Gas and NGL 1600 Plant Project
with

600MMSCFD Capacity

"Bid Boland"

“6026”

19

5-1- Backgrounds and Experiences in Oil
Refinery, Gas and Petrochemical Industries

B) Completed Projects:

Piping As Built drawings, detail design
of revamping units.

08/2004

09/2003

~13175

Pars Oil Co.

Engineering Services for Revamping of Process
Area &As Built Drawings

"Pars Oil Refinery"

“6055”

20

Basic design & preparation of EPC tender
documents for Bid Boland II gas refinery.

09/2004

07/2003

~20000

(NISGC)

BBII Gas Refinery Basic Design

"Bid Boland II Gas Refinery"

“6050”

21

Basic design and detail engineering and
Procurement engineering services.

06/2005

06/2002

~49000

Fajr-E-Jam Gas Refinery Plant Co.

LPG Plant Design

"Fajr-E-Jam Gas Refinery Plant"

“6027”

22

Design, engineering and Procurement services
for piping, electrical, I& C and civil construction Services for phase
I of cooling towers of PET2/PTA2 and interconnection lines between units.

09/2005

03/2002

~84000

Shahid Tondgooyan Petrochemical Co.

WWTP PET2/PTA2- Interconnections Units for
Phase 2

Tondgooyan Petrochemical Co.

"Bandar Imam" “6023 / II

23

Engineering and design services for reconstruction
and renovation of Pars Oil Refinery units.

11/2005

11/2004

~12000

Pars Oil Refinery Co.

Engineering and Design Services

(Technical Assistance)

for Production Units of

Pars Oil Refinery

“6081”

24

Basic design of tender document Preparation
for execution of refinery waste water collection system

01/2006

06/2005

~8800

(NIGC)

Design Services for

Refinery Waste Water Treatment System

“6093”

25

Design and engineering services for reconstruction and
renovation projects for Faravaresh Co. units within separate work orders
of Bandar Imam Petrochemical

07/2006

07/2003

~130000

Faravaresh Co.

(B.I.P.C)

Engineering & Design Services

(Technical Assistance)

Faravaresh Co.

"Bandar Imam Petrochemical Co."

“6058”

26

5-1- Backgrounds and Experiences in Oil
Refinery, Gas and Petrochemical Industries

B) Completed Projects:

Design and engineering services for reconstruction and
renovation projects for Basparan Co. units within separate work orders
of Bandar Imam Petrochemical

08/2006

08/2003

~15500

Basparan Co.

(B.I.P.C)

Engineering & Design Services

(Technical Assistance)

"Bandar Imam Petrochemical Co."

“6061”

27

Review and correction of basic design and detail engineering
for equipments.

01/2007

10/2004

~17100

(NIGC)

Equipment Design for Offsite and Storage
Tanks Areas Ilam Gas Treatment Plant

“6085”

28

Conceptual Study and Basic Design and Job
Description for Contractor selection for Fire Fighting Water Network

07/2007

03/2007

~1100

Tehran Refinery

Co.

Fire Fighting System Study and Design

“6125”

29

design and engineering services for reconstruction and
renovation project of Faravaresh Co. within Separate work Orders framework

07/2007

07/2006

~50000

Faravarash Co.

(B.I.P.C)

Engineering & Design Services

(Technical Assistance )

"Bandar Imam Petrochemical Co."

“6118”

30

Civil works detail engineering design for process, offsite,
temp. camp , green space, water irrigation network areas for Ilam Gas
Treatment Plant

08/2007

05/2004

~37500

(NIGC)

Detail Engineering for Ilam Gas Treating
Plant

“6070”

31

Study , review and design of refinery safety
systems according to safety & hazard and design of refinery process
section, that was provided by Propak of Canada

09/2007

03/2006

~27500

(NIGC)

Fire Fighting & Saftey Design Services

“6105

32

Detail engineering design and procurement
services

09/2007

06/2006

~1250

(NIGC)

Design of South Sub-Station of

Ilam Gas Treatment Plant

“6115”

33

Completion of detail engineering and procurement
services for establishment of HD/PP unit of Bandar Imam Research Center.

12/2007

08/2005

~24500

Bandar Imam Petrochemical Co.

Pilot Plant Design for HD/PP Unit of Bandar
Imam Petrochemical(Research Center)

“6058-76”

34

5-1- Backgrounds and Experiences in Oil
Refinery, Gas and Petrochemical Industries

B) Completed Projects:

Data collection and Basic design for Tendering

02/2008

08/2007

~1500

Tehran Refinery Co.

Heating system design for Railway Tankers

“6147”

35

Basic and Detail Design, precurment engineering
services & construction management of refinery waste water treatment
plant using Zenon Co. technology.

12/2008

06/2005

~55000 M.H +475,000 Euro

Pars Oil Co.

Industrial & Hygienic Establishment of Water
Treatment Plant for

"Pars Oil Co."

“6097”

36

Conceptual Study and Basic Design and EPC
Tender Document Preparation for Industrial and Non Industrial Parts
Including Onshore and Offshore Sections

02/2009

08/2007

~18800

Iran Gas Engineering and Development Company

Bandar Taheri Revamping and Development
Project

“6135”

37

Basic Design ,Preparing EPC documents and
Cost Control Planning

02/2009

05/2008

~5200

Tehran Refinery

Co.

Revamp Of Rey Tank Farm

fire Water Network

“6163”

38

Completion of Engineering services and preparing
Commissioning instruction and software preparation for control system
of Zenon equipments

06/2009

12/2008

~6500

Pars oil Co.

Industrial & Hygienic Establishment of water
Treatment Plant for "Pars oil Co."

6178

39

Management and Supervision

11/2009

07/2008

200 M.M

Ilam Gas Refinery Co.

Ilam Refinery

(MC)

“6169”

40

Basic Design Completion, Endorsement of
Basic design with cooperation of "B.V", Detail design and procurement
services

J.V of "Iran Industrial Development Co."
& "Amid Engineering & Development Co."

More than 40000 M.H & 200000 US $ (foreign
portion)

04/2009

09/2010

"Hold by Client"

Sulfur Removal Unit project for Ilam petrochemical
feed

“6175”

41

5-1- Backgrounds and Experiences in Oil
Refinery, Gas and Petrochemical Industries

B) Completed Projects: