Completed projects

A number of major projects performed by DPEC are briefly listed below, as a partial reference and indication of the nature and diversity fields of the works.

Project Client Years Man/Hours
1) Oil, Gas and Petrochemical Refineries & Industries Engineering & design services (technical assistance) reconstruction & design services. Bandar Imam Petrochemical Co. “BIPC”

Bandar Imam Petrochemical Co.

2006 165,000
Gas & NGL plants – piping system design & purchase services. Gachsaran “EIED”

Energy Industries Engineering & Design Co.

1999-2001 135,000
Engineering & design services (technical assistance).

Bandar Imam Petrochemical Co.

Faravaresh Co.

(BIPC)

2002-2005

130,000

Engineering & design (technical assistance) – reconstruction & renovation. Bandar Imam Petrochemical Co. Shahid Tondgooyan Petrochemical Co. 2001-2006 84,000
Engineering & design services

(technical assistance – reconstruction renovation)

Faravaresh Co.

(BIPC)

2005-2006 55,000
Engineering design & purchase services – LPG plant. Fajr – e- Jam Gas Refinery Fajr-e-Jam Gas Refinery Plant Co. 2000-2004 49,000
Engineering , design & assistance ww TP units & PET/PTA interconnections Shahid Tondgooyan Petrochemical Co. 2004-2005 31,600
2) Oil & Gas Transfer Pipelines Engineering design & tender documents – NGL transfer pipelines 1200 & 1300 of about 155 km. between plants of Gachsaran and BiBi Hakimeh Energy industries Engineering & design Co. (EIED) 1998-1999 33,000
Basic engineering services crude oil delivery from Bandar Abbass through Qeshm Island Qeshm Capital Company 2002-2003 25,400
Project design services of 56 inch pipeline for southern Pars – phases 4 & 5 (67 km)Asaluieh – Kangan AGIP IRAN/Bv/ Tehran– Jonoob T&C 2000-2002 24,000
3)Upstream and Surface Installations Data collection, tech. inspection, optimization studies, contract documents (EPC contract) in cooperation with Canadian SNC Lavalin Co. NISOC 2002-2003 50,000 (Iranian expertise)
Conceptual study, basic engineering design and provision of contract documents (EPC contract) Iran Central Oil Field Co. 2002-2005 16,550
Design, procurements & execution for modern measurement systems on oil transfer lines of Khuzestem oil and gas production companies (Joint EPC contract) NISOC 2003-2004 15,000
4) Power Generation, Transmission and Distribution Engineering services , supervision and site inspection – Rudshur 2000 MW gas power plant Arian Mahtab Gostar Co. 2001-2005 73,000
Engineering services at Tehran office and site supervision – south Isfahan 6×159 MW private power plant Iran Electric

Development Organization

2003-2004 38,000
Study, environmental report & obtaining authorization stamp for Khorramabad 1 & 2 Power Plants Tavanir Co. 2003-2005 12,0000
Feasibility study for expansion turbines in selected sites Ministry of Energy – Power Deputy 2004-2005 10,000
5) Drinking Water Transfer Lines, Storage & Treatment Project design and construction management, Lavan refinery 2 × 1800 m3/day MED type water desalination plant at Lavan Island Kish Water & Power Co. 1995-1996 36,000
Basic engineering & construction, overseeing 2 × 15000 m3/day MSF type water desalination at Chahbahar Sistan & Baluchestan Regional Water Co. 1999-2000 35,000
Project construction management – Almahdi 1800 m3 / day MED type water desalination plant at Bandar Abbas. Kish Water & Power Co. (KWPC) 1994-1995 11,000
6) Surface Water , Sewage Collection & Treatment Project design & construction management – Kish sewage treatment plant 3 × 300 m3/day, Kish Island Kish Water & Power Co. (KWPC) 1995-1996 8,000
Project design & construction management, Kish unit. 1 × 300 m3/day, Kish Island Kish Water & Power Co. (KWPC) 1994-1995 6,000
7)Other Industries: Basic & detail designs, baft ferrochrome factory 1500 ton/years capacity, Baft Sarcheshmeh Copper investment Co. 1995 32,000
Piping, electrical, control & instrument design Roham gas oxygen factory 85 ton/day capacity Karaj special road . Roham Gas co. 1994-1995 5,300